Service Description | Clients | Year |
|---|---|---|
| HAZOP study for JNPA, A2 Terminal Mumbai | Aegis Logistics Limited, Mumbai | 2024 |
| HAZOP study for M4 plot located at Pir Pau Terminal Gavanpada | Aegis Logistics Limited, Mumbai | 2024 |
| QRA & FERA studies - Inlet gas compression FEED project RDG | Nauvata Engineering Pvt Ltd | 2024 |
| QRA study for Petroleum & Non-petroleum Storage Tank Terminal at Pirpau Mumbai | Aegis Logistic Limited, Mumbai | 2024 |
| QRA studies for AVTL-3 at Kandla terminal | Aegis Logistic Limited, Mumbai | 2023 |
| QRA Study For 65 MLD STP Biogas plant at Arupara | VA Tech Wabag Limited (WABAG) | 2022 |
| Nandasan surface facility ONGC | Petro6 | 2021 |
| QRA Study for Well pad-Raageshwari | CIL | 2021 |
| QRA Study for RDG Terminal modification | CIL | 2021 |
| QRA Study for Nandasan Surface Facilities Project (NSFP). | HAL Offshore Ltd | 2021 |
| QRA Study for 20 no. of steel Pipelines & CNG Stations, SGL | Sabarmati Gas Limited, Gujrat. | 2021 |
| QRA Study for 20 no. of steel Pipelines & CNG Stations, SGL | Sabarmati Gas Limited, Gujrat. | 2020 |
| QRA Study for Proposed Installation of BS - VI, Mounded Bullet and CRU Projects at IOCL Guwahati Refinery, Assam | Indian Oil Corporation Limited, Guwahati Refinery | 2019 |
| QRA Study for 20 no. of steel Pipelines & CNG Stations, SGL | Sabarmati Gas Limited, Gujrat. | 2019 |
| QRA study including Dispersion and radiation study | SNF SA, France | 2019 |
| QRA for LPG Mundra Terminal/Plant | TATA consulting Engineers Limited, Mumbai | 2019 |
| QRA for 3 Projects (Mounded Bullet Project, BS-VI Project & CRU Project) of IOCL, Guwahati Refinery | IOCL, Guwahati Refinery | 2018/ 19 |
| QRA for Adani Mundra LPG terminal, Jetty and Pipelines | TATA consulting Engineers Limited, Mumbai / Simon India Limited | 2017 |
| QRA of Effluent treatment Plant (ETP) cum Water Injection Plant (WIP) for Assam asset for ONGC | HAL Offshore ltd, Mumbai / ONGC | 2017 |
| Ravva Terminal QRA | CIL, Gurgaon | 2015 |
| RGT QRA | CIL, Gurgaon | 2015 |
| VGT QRA & FERA Post Booster Gas Compressor | CIL, Gurgaon | 2014 |
| QRA of SVL TL Post Slop oil tank and Modifications | CIL, Gurgaon | 2014 |
| QRA of RGT100 facilities | CIL, Gurgaon | 2014 |
| QRA of Radhanpur Terminal | CIL, Gurgaon | 2014 |
| QRA of Suvali Terminal, Post Crude Oil Tank | CIL, Gurgaon | 2013 |
| QRA of 14 CNG stations and 43 KM Gas Pipeline | MGL, Mumbai | 2013 |
| QRA of Bhogat Terminal | CIL, Gurgaon | 2013 |
| QRA of Viramgam Terminal and Pipelines | CIL, Gurgaon | 2013 |
| QRA of MPT Post EPC s | CIL, Gurgaon | 2013 |
| QRA for INDAdeptG Unit at IOCL Guwahati Refinery | IOCL, Guwahati Refinery | 2012 |
| QRA of IOCL Paradip Refinery Project Poly Propylene Unit Odisha | FW, Gurgoan / IOCL, New Delhi | 2012 |
| QRA Study of 7 CNG Stations | GGCL, Surat | 2012 |
| QRA of Raageshwari Gas Terminal Post Slug Catcher | CEIL, Gurgaon | 2009 |
| QRA Study of High pressure Pipelines (12 & 14 ) | GGCL, Surat | 2012 |
| QRA Study of Bardoli CNG | GGCL, Surat | 2012 |
| QRA Study of Pipeline (Jhagadia to UPL) | GGCL, Surat | 2012 |
| QRA Study of 3 Pipelines (Majura, Tadkeshwar & Lajpore) | GGCL, Surat | 2012 |
| QRA Study of Bharuch Coco CNG | GGCL, Surat | 2012 |
| QRA Study of Kim-II CNG | GGCL, Surat | 2012 |
| QRA Study of Udhana Pandesera | GGCL, Surat | 2012 |
| QRA Study of Olpad CGS | GGCL, Surat | 2012 |
| QRA Study for AWP08-MPT Pipelines | CEIL/MMPL, Mumbai | 2012 |
| QRA Study for Aishwariya Wellpads (AWP08 & AWP07) | CEIL/MMPL, Mumbai | 2012 |
| QRA of Sardar Bridge Crossing Pipeline | GGCL, Surat | 2011 |
| QRA of 7 CNG Stations | GGCL, Surat | 2011 |
| QRA of Mora & Jhagadia Compressor Station | GGCL, Surat | 2011 |
| QRA of Palsana-Bardoli Pipe line | GGCL, Surat | 2011 |
| QRA of Palsana Baleshwar reinforcement Pipe Line | GGCL, Surat | 2011 |
| QRA of Surat Supply SecurityPipe Line | GGCL, Surat | 2011 |
| QRA of Bharuch East Pipeline | GGCL, Surat | 2011 |
| QRA of 8 CNG Stations, Gujarat | GGCL, Surat | 2011 |
| QRA of Vareli CGS, Gujarat | GGCL, Surat | 2011 |
| QRA of IOCL Paradip Refinery Project [Covering All the Units (27Nos.) of Refinery and also include Fire & Explosion Analysis], Odisha | FW, Gurgoan / IOCL, New Delhi | 2011 |
| QRA of VRGM IOCL Spur Line Project | L&T, Gulf/CEIL, Gurgaon | 2011 |
| QRA of Aishwarya Field Development [AWP08 MPT Fluid Trunk Pipeline], Rajasthan | Technip, Noida | 2011 |
| QRA of Aishwarya Field Development [AWP08 & AWP01 Well Pads], Rajasthan | Technip, Noida | 2011 |
| QRA of Vyara CNG Station, Vyara | GGCL, Surat | 2011 |
| QRA of SRAACL Chloromethane Plant, Kurnool [AP] | TCE, Mumbai | 2010 |
| QRA of Nagalpur CNG Station, Gujarat | SGL, Gandhinagar | 2010 |
| QRA of 6 CNG Stations, Gujarat | GGCL, Surat | 2010 |
| QRA of BA Wellpad BP-15, BA Field | CEIL, Gurgaon | 2010 |
| QRA of Mangala Processing Terminal, Rajasthan | CEIL, Gurgaon | 2010 |
| QRA of MPT Capacity Expansion Project (Train-4) | CEIL, Gurgaon | 2010 |
| QRA & Consequence Analysis of Jolva CNG Station | GGCL, Surat | 2010 |
| QRA of 4 MS from Mansa to Vijapur, Mansa | SGL, Gandhinagar | 2010 |
| QRA of 4 MS from Gandhinagar to Dehgam, Gandhinagar | SGL, Gandhinagar | 2010 |
| QRA of 4 MS from Himmatnagar to Idar, Himmatnagar | SGL, Gandhinagar | 2010 |
| QRA of 4 MS from Mehsana to Unjha, Mehsana | SGL, Gandhinagar | 2010 |
| QRA of Palsana, Bhatena & Kamrej CNG Stations | GGCL, Surat | 2010 |
| Revised QRA of RGT-MPT Pipeline, Mangla | CEIL, Gurgaon | 2010 |
| QRA of Off-spec Tanks | CEIL, Gurgaon | 2009 |
| QRA of Palsan Burdoli Pipeline, Palsana | GGCL, Surat | 2009 |
| QRA of 5 CNG Stations | GGCL, Surat | 2009 |
| QRA of Bhogat Terminal, Bhogat | CEIL/TCE, Mumbai | 2009 |
| QRA of SGL Pipeline Network, Gujarat | SGL, Gandhinagar | 2009 |
| QRA of Palej CNG Station, Palej | GGCL, Surat | 2009 |
| QRA of Byculla Pipeline Crossing, Mumbai | MGL, Mumbai | 2009 |
| QRA of ONGC Olpad GCS, Olpad (Gujarat) | TATA Projects /ONGC, Gujarat | 2009 |
| QRA of Surat Chowk CNG Station | GGCL, Gujarat | 2009 |
| QRA of 4 CGS (Amboli, Jhagadia, Vadoli & Ank-CGS-I) in Ankleshwar | GGCL, Gujarat | 2009 |
| QRA of 3 CGS (Atodara, Sachin & Palsana) in Surat | GGCL, Surat | 2009 |
| QRA of Early Gas Supply System | CEIL, Gurgaon | 2009 |
| QRA of City PlusCNG Station | GGCL, Surat | 2009 |
| QRA of Radhanpur Terminal, Radhanpur | CEIL/TATA, Mumbai | 2009 |
| QRA of C/S pipeline network in Mumbai | MGL, Mumbai | 2009 |
| QRA of Pipelines at Kim Kosamba & Kim-Karanj | GGCL, Surat | 2009 |
| QRA of SUPP & EOR-Mangla field | CEIL, Gurgaon | 2009 |
| QRA of KG gas intake facility at Mora | GGCL, Surat | 2009 |
| QRA of Palej CNG Station | GGCL, Surat | 2009 |
| QRA of Raageshwari Gas Terminal | CEIL, Gurgaon | 2008 |
| QRA of Raageshwari 4 Well Pads | CEIL,Gurgaon | 2008 |
| QRA of RGT-MPT Gas & Condensate Pipelines | CEIL, Gurgaon | 2008 |
| QRA of Bhogat Terminal | CEIL, Gurgaon | 2008 |
| QRA of Viramgam Terminal, Viramgam | IOTL/CEIL, Gurgaon | 2008 |
| QRA of Kim CNG Station | GGCL, Surat | 2008 |
| QRA of Kamrej CNG Station | GGCL, Surat | 2008 |
| QRA of IPSHEM Campus & Samundra Surakhsha | ONGC, IPSHEM, Goa | 2008 |
| QRA of MAPL Re-Routing 8 & 12 Pipeline Network, Surat | GGCL, Gujarat | 2008 |
| QRA of Dahej Pipeline Network, Dahej | GGCL, Gujarat | 2008 |
| QRA of SV-4 to Surat Super Yarn pipeline, Alonj | GGCL, Gujarat | 2008 |
| QRA of PPN Onshore Gas Processing Facility | Technip & HOEC, Tamil Nadu | 2008 |
| QRA of Nerul-Kharghar 8 pipeline, | MGL, Mumbai | 2007 |
| QRA of CNG Filling Stations Varachcha. | GGCL, Surat | 2007 |
| QRA of Bharuch DPRS & CNG Filling Stations | GGCL, Surat | 2007 |
| QRA of CNG station Modifications | GGCL, Surat | 2007 |
| Risk Assessment of RA-RT Pipeline | CEIL, Chennai | 2007 |
| QRA of Valia Station | GGCL, Surat | 2007 |
| QRA of Mora Station | GGCL, Surat | 2007 |
| QRA of Vapi Pipeline | GGCL, Surat | 2006 |
| QRA of Rahadpor CGS | GGCL, Surat | 2006 |
| QRA of Laying a New Pipeline (3 Options from GSPCL supplying point to Rahadpor CGS of GGCL) | GGCL, Surat | 2006 |
| QRA of City Gate Station at Surat and Ankleshwar | GGCL, Surat | 2006 |
| QRA of MAPL pipelines and CNG Stations | GGCL, Surat | 2006 |
| QRA of GGCL pipeline network (HAPI and AJPL Pipeline) | GGCL, Surat | 2006 |
| QRA of Gas Marketing Facilities at Hazira | BGEPIL, Mumbai | 2005 |
| Financial Risk assessment study | RCF, Mumbai | 2003 |
Service Description | Clients | Year |
|---|---|---|
| HAZID / Risk Analysis of decommissioning SOP for 24” dia BPCL’s Black oil pipeline from jetty to AVTL allotted plot-J2. | Aegis Vopak Terminals Ltd | 2025 |
| HAZID study for Tapti Decommissioning Project Phase-II | L&T offshore, Mumbai | 2024 |
| HAZID study for feed for Alkali Surfactant Polymer (ASP) injection and surface facility development at MWP11 & MWP19 | Petro6, Chennai / Cairn India Limited | 2024 |
| HAZID study for Lactic Acid (LA) and Polylactic Acid (PLA) Plant of Gulf Biopolymers Industries Ltd (GBI) in KEZAD, Abu Dhabi | Thyssenkrupp Uhde India Private Limited, Mumbai | 2024 |
| HAZID study of 12 wells hookup in MWP 03, 04, 06, 08, 09, 19 & 21 | Petro6, Chennai / Cairn India Limited | 2024 |
| HAZID study for RDG additional infill wells project FEED for Inlet Gas Compression Project | Nauvata Energy Transition Enterprise Private Limited, Bangalore | 2024 |
| HAZID study for Tapti Decommissioning Project | L&T offshore, Mumbai | 2023 |
| HAZID study for NE field Stage-III (Phase-2) project | Petro6, Chennai / Cairn India Limited | 2023 |
| HAZID study of Poly Butadiene Rubber (PBR) Plant of capacity 60 KTPA along with associated facilities at, “IOCL Panipat Refinery & Petrochemical Complex“, At Panipat | tKIS, Mumbai | 2023 |
| HAZAN (Hazard Analysis) Study for Utility Boiler and associated system (Package-9A) for Rajasthan Refinery Project (RRP) of HRRL, Barmer, Rajasthan | Thermax, Pune | 2023 |
| HAZID study for Pipeline Operating Centre (POC) Optimization of Yetagun onshore facility of Gulf Petroleum Myanmar Company Limited | Easy Chem Engineering, Chennai | 2023 |
| HAZID Study for Bhagyam BWP05 Well pad early Hook-up | Cairn / Vedanta, Gurgaon | 2023 |
| HAZID and EERA study of Tapti offshore complex decommissioning Project | L&T offshore, Mumbai | 2023 |
| HAZID and What-if study for CPF, Gathering station, production circle as part of Asthan Field Development Project | Worley, Oman / Zallaf, Libiya | 2022 |
| HAZID study for N2 and Air dryer package for RDG | Petro6, Chennai / Cairn India Limited | 2022 |
| HAZID study for HGU for IOCL Baruni Refinery | Technip, Noida | 2022 |
| HAZID study for Offshore WHP (East) - KG/OSDSF/GSKW Field Development Project, Kakinada | Petro6, Chennai / Oil India Limited | 2022 |
| HAZID for MS Block HRRL Refinery | Technip, Noida / EIL / HRRL | 2021 |
| HAZID study for Cairn Aishwarya infill wells project | Petro6, Chennai | 2021 |
| Design Review and HAZID for RAZU, KOC | SNF, France | 2021 |
| HAZID of UNLF ASP project of KOC-Kuwait | SNF, France / Kuwait Oil Company | 2020 |
| HAZID of RAZU ASP project of KOC-Kuwait | SNF, France / Kuwait Oil Company | 2020 |
| HAZID of FPSO | SP Armada | 2020 |
| HAZID / ENVID of Tinrhert Field Development Project-EPC-1 (Inlet Separation and Boosting Facilities in Ohanet) | Petrofac , Sharjah | 2019 |
| HAZID for Production Facilities as part of SAMA ASP pilot Project, KOC | SNF, France / Kuwait Oil Company | 2019 |
| HAZID of Alkaline Surfactant Polymer Injection Pilot Project for SAMA field, KOC | SNF, France / Kuwait Oil Company | 2018 |
| HAZID of Wellpads and Mangala Processing terminal Phase- 1 under Mungala Upgradation Project (MUP-2) | 2018 | |
| HAZID of Hydrogen Generation Unit (HGU) of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | TechnipFMC, Noida / Visakh Refinery, HPCL | 2018 |
| HAZID of Salalah LPG Project- detailed Engineering | Oman Gas Co, Oman (Petrofac , Sharjah) | 2017 |
| HAZID of Effluent treatment Plant (ETP) cum Water Injection Plant (WIP) for Assam asset for ONGC | HAL Offshore ltd, Mumbai / ONGC | 2017 |
| HAZID study for FPSO – Vendor Packages (IA compressors, Chemical Injection Package, Hypo-chlorination package, STG, Water injection Package, Produced water treatment package, Flare package, N2 generation package, Fresh Water treatment package, Fiscal Metering, Boilers, Sea Water Coarse Filter | Tuff-offshore, Singapore | 2016 |
| HAZID study for FPSO – Main Process & utilities, Avantgarde / Tuff-offshore, Singapore | Tuff-offshore, Singapore | 2016 |
| HAZID for Diving Job at SVL | CIL, Gurgaon | 2014 |
| HAZID Study for Deployment of Desh Rakshak at Panna Field | BGEPIL, Mumbai (Mercator, Mumbai) | 2014 |
| HAZID of Prem Pride-Tendom Mooring | BGEPIL, Mumbai (Mercator, Mumbai) | 2014 |
| HAZID of SRP FEED | CIL, Gurgaon | 2014 |
| HAZID for Tapti phase-II compression project | BGEPIL, Mumbai | 2013 |
| HAZID Ravva Field Life Cycle Project (RC & RD platform) | CIL, Chennai | 2013 |
| HAZID of Gas Sales Project at Viramgam | CIL, Gurgaon | 2013 |
| HAZID - intelligent pigging operation | BGEPIL, Mumbai | 2013 |
| HAZID of Shore base Operation | CIL, Gurgaon | 2013 |
| HAZCON of Eastwind-365 | HOPL, Mumbai | 2013 |
| HAZID of Mangla infill wells | CIL, Gurgaon | 2013 |
| HAZID of MPT Modifications- EOR project | CIL, Gurgaon | 2013 |
| HAZID of Bhagyam Infill wells | CIL, Gurgaon | 2013 |
| HAZID of LA gas lift compressor | CIL, Gurgaon | 2013 |
| HAZID of RI platform | CIL, Gurgaon | 2013 |
| HAZID Study for DHDS & SRU-ARU-SWS, CDU Units, | Essar Refinery, Vadinar | 2012 |
| HAZID Study for NHT-CCR, BBU, FCC & UGS units, | Essar Refinery, Vadinar | 2012 |
| HAZID for Pipe Stacking for Fire Water Network System – ONGC Uran | Tata Project, Mumbai | 2012 |
| HAZID of Captive Power Plant (BOP), Kalinga Nagar | Tata Power, Mumbai | 2012 |
| HAZID Study for Aishwariya Wellpads (AWP08 & AWP07 | CEIL/MMPL, Mumbai | 2012 |
| HAZID of RA-RT(2) Line | CEIL, Chennai | 2012 |
| HAZID of WISU-II Project, Ravva | CEIL, Chennai | 2011 |
| HAZID/ENVID of New Panna SPM Project, Panna Field | BGEPIL, Mumbai | 2011 |
| HAZID of PA CCD Pump, Panna Field | BGEPIL, Mumbai | 2010 |
| HAZID of PL Brownfield works on PPA, Panna Field | Mustang, Mumbai | 2010 |
| HAZID of Crude Oil Surge Vessel at PPA, Panna Field | BG/LTV, Mumbai | 2010 |
| HAZID of EOR facility, Mangla | CEIL, Gurgaon | 2010 |
| HAZID of Unloading Operation at Radhanpur Terminal | CEIL, Gurgaon | 2010 |
| HAZID of BH EWT Project | CEIL, Gurgaon | 2010 |
| HAZID of Diving operation, Suvali | CEIL, Gurgaon | 2009 |
| HAZID of Bhogat Terminal, Bhogat | CEIL/TCE, Mumbai | 2009 |
| HAZID of Conductor protector – offshore platform | CEIL, Suvali | 2009 |
| HAZID of Ravva Marine Job | CEIL, Gurgaon | 2009 |
| HAZID of Well Clean-up at PK | British Gas, Mumbai | 2009 |
| HAZID of Radhanpur Terminal, Radhanpur | CEIL/TATA, Mumbai | 2009 |
| HAZCON of Riser Installation, BG Hydra | BG/Swiber, Mumbai | 2009 |
| HAZCON of Pipeline Laying & Installation, BG Hydra | BG/Swiber, Mumbai | 2009 |
| HAZID of Tapti Brownfield Construction, Tapti field | British Gas, Mumbai | 2009 |
| HAZID of Condensate Tanker Loading Facility, SUPP | CEIL, Gurgaon | 2009 |
| HAZOP & HAZID of Viramgam Terminal, | CEIL/ IOTL, Gurgaon | 2008 |
| HAZID Study for PL Platform | British Gas, Mumbai | 2008 |
| HAZID Study of typical Well Pad B&A | CEIL, Gurgaon | 2008 |
| HAZID of Ravva Pipeline Project | CEIL, Chennai | 2008 |
| HAZID of Production Activities on PANNA Platform | British Gas, Mumbai | 2008 |
| HAZID Study of Onshore Gas processing Facility | Technip & HOEC, Tamil Nadu | 2007 |
| HAZID of most volatile material like Naphtha and MS for Vadinar Jetty Terminal | ESSAR OIL LTD., Mumbai | 2007 |
| HAZID and SIMOPS Study of Well Test at H-31 Rig | CEIL, Delhi | 2007 |
| HAZID Study of Multiphase Pump Project at Ravva Facilities | CEIL, Ravva | 2007 |
| HAZID of CB-X1 Pipeline project | CEIL, Suvali | 2007 |
| HAZID of RC RT pipeline installation | CEIL, Chennai | 2007 |
| HAZID for Pipeline installation in Tapti Field | British Gas, Mumbai | 2006 |
| HAZID of CNG Stations | GGCL, Gujarat | 2006 |
| HAZID study for Ravva Facilities | CEIL, Chennai | 2005 |
| HAZID of Panna Compression Enhancement Project | BGEPIL, Mumbai | 2005 |
| HAZID for identification of Critical task for drilling in KG basin | GSPC, Gandhinagar | 2004 |
| HAZID of Rig move and simultaneous production and drilling operations for BG India | BGEPIL, Mumbai | 2004 |
| HAZID of Ravva onshore and offshore facilities interfacing | CEIL, Chennai | 2002 |
Service Description | Clients | Year | |||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| HAZOP of Ravva onshore and offshore facilities | Cairn Energy, Chennai | 2002 | |||||||||||||||||||||||||||||||
| HAZOP of Rashtriya Chemical and fertilizer | RCF, Mumbai | 2003 | |||||||||||||||||||||||||||||||
| HAZOP of Flame detection system | British Gas, Mumbai | 2003 | |||||||||||||||||||||||||||||||
| HAZOP of Process gas compressor system at PPA complex | British Gas, Mumbai | 2003 | |||||||||||||||||||||||||||||||
| HAZOP of Rig move and simultaneous production and drilling operations for BG India | British Gas, Mumbai | 2004 | |||||||||||||||||||||||||||||||
| HAZOP of TPP offshore process complex | British Gas, Mumbai | 2004 | |||||||||||||||||||||||||||||||
| HAZOP of Process modification (Dew Point Control) at Suvali terminal | Cairn Energy, Chennai | 2004 | |||||||||||||||||||||||||||||||
| HAZOP study of Critical Fluids –Furnace No. 1 | Lonmin platinum, South Africa | 2004 | |||||||||||||||||||||||||||||||
| HAZOP of Produced Water of Ravva Terminal | Cairn Energy, Chennai | 2005 | |||||||||||||||||||||||||||||||
| HAZOP of Gas Sales Marketing Facilities at Hazira | British Gas, Mumbai | 2005 | |||||||||||||||||||||||||||||||
| HAZOP of Panna Compression Enhancement Project | British Gas, Mumbai | 2005 | |||||||||||||||||||||||||||||||
| HAZOP of Panna Process Complex –Post PCE | British Gas, Mumbai | 2005 | |||||||||||||||||||||||||||||||
| HAZOP study for Ravva Facilities | Cairn Energy, Chennai | 2005 | |||||||||||||||||||||||||||||||
| HAZOP of CNG Stations | GGCL, Gujarat | 2006 | |||||||||||||||||||||||||||||||
| HAZOP of MAPL Pipelines | GGCL, Gujarat | 2006 | |||||||||||||||||||||||||||||||
| HAZOP of Zero Flaring Project on Panna Process Complex (PPA) | British Gas, Mumbai | 2006 | |||||||||||||||||||||||||||||||
| HAZOP of Mercaptan Dosing System | GGCL, Gujarat | 2006 | |||||||||||||||||||||||||||||||
| HAZOP of Adavipalem, Endamuru and Narsapur GGS | ONGC, Rajamundry | 2006 | |||||||||||||||||||||||||||||||
| HAZOP OF Mora Station | GGCL, Gujarat | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of Valia Station | GGCL, Gujarat | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of CNG station Modifications | GGCL, Gujarat | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of VAPI-Metering Skid | GGCL, Gujarat | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of Direct Gas Marketing | British Gas, Mumbai | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of S1 facilities | Cairn Energy, Delhi | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of ALHF expansion at Suvali Terminal | Cairn Enegy, Suvali | 2007 | |||||||||||||||||||||||||||||||
| HAZOP of PANNA Clamp-On Projects | British Gas, Mumbai | 2008 | |||||||||||||||||||||||||||||||
| Ravva Pipeline Project-HAZOP | Cairn Energy, Chennai | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Tatipaka mini Refinery, Tatipaka | ONGC, Tatipaka | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Bhagyam&Aishwariya fields development | Cairn Energy, Delhi | 2008 | |||||||||||||||||||||||||||||||
| HAZOP Study of typical Well Pad B&A | Cairn Energy, Delhi | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Palej, Asjol& North Balol Terminals | HOEC, Baroda | 2008 | |||||||||||||||||||||||||||||||
| HAZOP Study of Hot Oil Heater | British Gas, Mumbai | 2008 | |||||||||||||||||||||||||||||||
| HAZOP study of Construction of HOH on PPA | British Gas, Mumbai | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Viramgam Terminal, | Cairn Energy, Delhi | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Mangla Process Terminal Packages | Cairn Energy, Delhi | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Raageshwari Gas Terminal & Well Pads | Cairn Energy, Delhi | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of SUPP & EOR | Cairn Energy, Delhi | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of KG gas intake facility at Mora | GGCL, Surat | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Zero Flaring Project on Panna offshore Process Complex | British Gas, Mumbai | 2008 | |||||||||||||||||||||||||||||||
| HAZOP of Water Dumping Project | British Gas, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Tapti Brownfield Construction, Tapti field | British Gas, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of KG gas intake facility at Amboli | GGCL, Surat | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Radhanpur Terminal | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Well Clean-up at PK | British Gas, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Zero flaring Skid | British Gas, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Well Unloading | British Gas, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Rageshwari Early Gas Supply System | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of RGT Slug Catcher | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Revised SUPP & EOR Facility at Mangla | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of 4 Line Modification | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP Study for New Surge Vessel at PPA Platform | British Gas, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Bhogat Terminal, Bhogat | TCE, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of DRS, CGS & CNG, Mumbai | MGL, Mumbai | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of Gas Start-up, Midstream | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of MPT Off-spec Tanks, Mangla | Cairn Energy Delhi | 2009 | |||||||||||||||||||||||||||||||
| HAZOP of BH EWT Project | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Train-I Modification at MPT, Mangla | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Modifications at Oman Refinery & petrochemical Complex (ORPC), Sohar-Oman | ORPC, OMAN | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of EOR facility, Mangla | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Future Steam Trap on 6th Boiler at MPT | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Injection Water & Power Fluid Pumps | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Split Flow & Crude Oil Surge Vessel, Mumbai | BG/LTV, Mumbai | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of New line from Well Pad#9 to MPT | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Palsana – Vareli Pipeline Upgradation | GGCL, Surat | 2010 | |||||||||||||||||||||||||||||||
| HAZOPs Review of CGS, DRS & Compressor | MGL, Mumbai | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of MPT Capacity Expansion Project (Train-4) | Cairn Energy Delhi | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Fuel gas conditioning Skid | IOTL, Mumbai | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Nagalpur CNG Station, Gujarat | SGL, Gandhinagar | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Odoriser System, Gujarat | GGCL, Surat | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of PL Brownfield works on PPA, Panna Field | Mustang, Mumbai | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of Underground CGS, Taloja | MGL, Mumbai | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of PA CCD Pump, Panna Field | British gas, Mumbai | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of GSU, GDU, DPDU, GSU/GDU Common, Utilities & Vendor Packages for ONGC, Hazira TL | ONGC/ L&T, Fridabad | 2010 | |||||||||||||||||||||||||||||||
| HAZOP of High water cut in Suvali | Cairn Energy Delhi | 2011 | |||||||||||||||||||||||||||||||
| HAZOP of New Panna SPM Project, Panna Field | British gas, Mumbai | 2011 | |||||||||||||||||||||||||||||||
| HAZOP of MTA Well Clean-up | British gas, Mumbai | 2011 | |||||||||||||||||||||||||||||||
| HAZOP ofLPG Recovery Unit, GSU, CHU, CFU, Utilities, Tie-ins & Vendor Packages for ONGC Uran TL | ONGC/ L&T, Fridabad | 2011 | |||||||||||||||||||||||||||||||
| HAZOP Revalidation of 26 units of Meena Al- Ahamadi (MAA) refinery-KNPC | |||||||||||||||||||||||||||||||||
| [Hydrocracker | Hydrogen production 1 | 2 | 3 | 4; Sulphuric acid regeneration; CDU 3 | 4 | 5; Hydrogen recovery | New ATK Merox; GLO Feed; Gas Plant Train1 | 2 | 3; Kerosene desulphurisation; Feed Treatment; Propylene recovery unit; Ethane recovery unit; ARD 1 | 2 | 3 | 4; Gas oil Desulphurisation; MTBE plant; New Gas oil desulphurisation | SWS 1 | 2; NHT & CCR 1&2; LPG Bulk storage & pump house | New Oil peer | SRU 1 | 2 | 3 | 4 | Bitumen Blowing Unit | Tail gas Treating 1 | 2 | 3],KNPC | Kuwait (L&T | Faridabad),2011 | ||||||||
| HAZOP of Vareli CGS, Vareli | GGCL, Surat | 2011 | |||||||||||||||||||||||||||||||
| HAZOP Revalidation of 32 units of Meena Abdullah (MAB) refinery-KNPC | |||||||||||||||||||||||||||||||||
| [Crude Unit | RCD Unibon | Hydrogen Unit | New Crude Unit | ARDS Unit | Vacuum Rerun Unit | Hydrocracker Unit | Diesel Hydrotreater Unit | Kerosene Hydrotreater Unit | Naphtha Hydrotreater Unit | New Hydrogen Unit | Hydrogen Make-up | Gas Handling System | Hydrogen Recovery Unit | Delayed Coker Unit | Merox Unit | Sulfur Recovery Unit | Tail Gas Treating Unit | Amine Regeneration Unit | Sour Water Stripping Unit | Cooling Water System | Fuel Systems | Inert Gas System | Air System | Water Treatment System | Oil Movement System | Flare System | Waste Water Treatment System | Shipping and Inter Refinery Transfer System | Steam System | Vacuum Distillation Unit | ATK Merox Unit ],KNPC | Kuwait (L&T | Faridabad),2011 |
| HAZOP of IOCL Paradip Refinery [Crude Oil Storage Tanks, Propylene Storage Bullet, LPG Storage Bullet & Product Storage Tanks] | IOCL, (IOTDE, Gurgaon) | 2011 | |||||||||||||||||||||||||||||||
| HAZOP of RA-RT(2) Pipeline | Cairn Energy Chennai | 2012 | |||||||||||||||||||||||||||||||
| HAZOP Study for AishwariyaWellpads (AWP08 & AWP07) for Cairn Energy | MMPL, Mumbai | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Captive Power Plant (BOP), Kalinga Nagar | Tata Power, Mumbai | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Captive Power Plant (Boiler Unit), Kalinga Nagar | Tata Power, Mumbai | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Fire Water Network System – ONGC Uran | Tata Project, Mumbai | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Olpad CGS, Surat | GGCL, Surat | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of CNG compressor, Surat | GGCL, Surat | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of CNG compressor, Dispenser | GGCL, Surat | 2012 | |||||||||||||||||||||||||||||||
| HAZOP Study for NHT,CCR, BBU, FCC & UGS units, | Essar Refinery, Vadinar | 2012 | |||||||||||||||||||||||||||||||
| HAZOP Study for DHDS, SRU,ARU,SWS, CDU Units, | Essar Refinery, Vadinar | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Instrument Air System | British Gas, Mumbai | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Saraswati Oil Field Development Project | Cairn Energy Delhi | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Nitrogen Blanketing of Crude Oil Storage Tanks | Cairn Energy Delhi | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of Raag Oil Development Project – WP1 | Cairn Energy Delhi | 2012 | |||||||||||||||||||||||||||||||
| HAZOP of U/G DRS | SGL, Gandhinagar | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of Type-III CNG Cascade | MGL, Mumbai | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of RI platform | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of LA gas lift compressor | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP Study of COT & PIT | Essar Refinery, Vadinar | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of Bhagyam Infill wells | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of BWP15 Injectivity test with Thumbli water | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of MPT Modifications- EOR project | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of Mangla infill wells | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of STD water dumping | British Gas, Mumbai | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of Gas Sales Project at Viramgam | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of Raag 1 & 3 | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP study for South Tank Farm (STF) , Jazan refinery, | Saudi ARAMCO/ Petrofac | 2013 | |||||||||||||||||||||||||||||||
| HAZOP study for North Tank Farm (NTF) Jazan refinery, Saudi ARAMCO | Saudi ARAMCO/ Petrofac | 2013 | |||||||||||||||||||||||||||||||
| HAZOP study for Vendor Packages for STF & NTF, Jazan refinery, Saudi ARAMCO | Saudi ARAMCO/ Petrofac | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of RGT- DCNs & ECNs | Cairn Energy Delhi | 2013 | |||||||||||||||||||||||||||||||
| HAZOP for Tapti phase-II compression project | British Gas, Mumbai | 2013 | |||||||||||||||||||||||||||||||
| HAZOP of ISOSIV Unit | IOCL, Guwahati Refinery | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of EOR Project, Gurgaon | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of BAB Compression project | ADCO, Abu Dhabi / Petrofac | 2014 | |||||||||||||||||||||||||||||||
| HAZOP study for Sohar refinery improvement project (SRIP)- Main process units (GSU/SWS/ARU and Tank farm & Utilities) | ORPIC Oman/ Petrofac | 2014 | |||||||||||||||||||||||||||||||
| HAZOP study for Sohar refinery improvement project (SRIP)- Vendor packages | ORPIC Oman/ Petrofac | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Suvali Terminal and Offshore | Cairn Energy, Surat | 2014 | |||||||||||||||||||||||||||||||
| HAZOP study for MUP FEED | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Heat recovery steam generator (HRSG) | Thermax, Pune | 2014 | |||||||||||||||||||||||||||||||
| HAZOP for RGT 100 MMSCFD | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of MPT debottlenecking Project | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Aishwariya Infill wells | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of SRP FEED | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Slop Oil Tank | Cairn Energy Delhi | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Alrar Inlet Separation and Boosting Facilities (Process, Utility Systems & Vendor Packages) – Algeria | Sonatrach, Algeria/ Petrofac | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Prem Pride-Tendom Mooring | British Gas/Mercator, Mumbai | 2014 | |||||||||||||||||||||||||||||||
| HAZOP of Reggane NRPOD Project Main Process & Utilities | GRN, Algeria/Petrofac | 2015 | |||||||||||||||||||||||||||||||
| HAZOP of Reggane NRPOD Project -Vendor Packages | GRN, Algeria/Petrofac | 2015 | |||||||||||||||||||||||||||||||
| HAZOP of HIPPS at PC/PG/PF | British Gas, Mumbai | 2015 | |||||||||||||||||||||||||||||||
| HAZOP of Thermal Fluid Heating System | L&T, Mumbai | 2015 | |||||||||||||||||||||||||||||||
| HAZOP of SALALAH LPG Extraction Project, Oman | Oman Gas Co, Oman /Petrofac | 2015 | |||||||||||||||||||||||||||||||
| HAZOP study for FPSO – Main Process & utilities, Avantgarde / Tuff-offshore, Singapore | Tuff-offshore, Singapore | 2016 | |||||||||||||||||||||||||||||||
| HAZOP study for FPSO – Vendor Packages (IA compressors, Chemical Injection Package, Hypo- chlorination package, STG, Water injection Package, Produced water treatment package, Flare package, N2 generation package, Fresh Water treatment package, Fiscal Metering, Boilers, Sea Water Coarse Filter | Tuff-offshore, Singapore | 2016 | |||||||||||||||||||||||||||||||
| HAZOP Study – Petrorabigh- LPG, Benzene & Para- xylene Tanks | Saudi ARAMCO /Sumitamo Japan | 2016 | |||||||||||||||||||||||||||||||
| HAZOP Study - Fadhili Gas Plant - GSU & TGTU | Saudi ARAMCO /Petrofac | 2016 | |||||||||||||||||||||||||||||||
| HAZOP of Heat Recovery Steam Generator for RCF, Thal | Thermax, Pune | 2016 | |||||||||||||||||||||||||||||||
| HAZOP of Utility Boiler for Dangote refinery | Thermax, Pune / EIL | 2016 | |||||||||||||||||||||||||||||||
| HAZOP of DRA Injection packages for Sohar Refinery Improvement Project in Sohar, Oman – | ORPIC Oman/ Petrofac | 2016 | |||||||||||||||||||||||||||||||
| HAZOP of Ozonation package, Condensate pumping trap and design changes for Sohar Refinery Improvement Project in Sohar | ORPIC Oman/ Petrofac | 2016 | |||||||||||||||||||||||||||||||
| HAZOP of LPG Odorant Package & Extender Oil Pumps – Petro Rabigh Project | Saudi ARAMCO / Sumitamo Japan | 2017 | |||||||||||||||||||||||||||||||
| HAZOP of Antistatic Additive Chemical (J60-U-604) for Jazan Refinery Tank Farm Project | 2017 | ||||||||||||||||||||||||||||||||
| HAZOP of Balance System (Utility Header, HT deletion of Underground line & Requirement of LPG tanker emergencydraining for Jazan Refinery Tank Farm Project | Saudi ARAMCO /Petrofac | 2017 | |||||||||||||||||||||||||||||||
| HAZOP of Drinking Water Chiller System for Jazan RefineryTank Farm Project | Saudi ARAMCO /Petrofac | 2017 | |||||||||||||||||||||||||||||||
| HAZOP of Lift Stations (J55 & J60 Area) for Jazan RefineryTank Farm Project | Saudi ARAMCO /Petrofac | 2017 | |||||||||||||||||||||||||||||||
| HAZOP of Waste Water Treatment Package (WWTP) for Jazan Refinery Tank Farm Project | Saudi ARAMCO /Petrofac | 2017 | |||||||||||||||||||||||||||||||
| HAZOP of Effluent treatment Plant (ETP) cum Water Injection Plant (WIP) for Assam asset for ONGC | HAL Offshore ltd, Mumbai / ONGC | 2017 | |||||||||||||||||||||||||||||||
| HAZOP Study of vendor packages [Chemical Injection package, Side stream filter package, Sulphur loading arm and vapour recovery package] - Fadhili Gas project | Saudi ARAMCO /Petrofac | 2017 | |||||||||||||||||||||||||||||||
| HAZOP Study for AdaniMundra LPG terminal | Simon India Limited, Faridabad | 2017 | |||||||||||||||||||||||||||||||
| HAZOP of packages (Wet Air Oxidation, Thermal oxidiser and Chemical injection packages) for Jazan Refinery Tank Farm Project | Saudi ARAMCO /Petrofac | 2017 | |||||||||||||||||||||||||||||||
| HAZOP study for Farabi Normal Paraffin and Derivatives Complex, Yanbu, KSA | FarabiYanbu Petrochemicals Company, KSA/L&T Chiyoda, Vadodara | 2017 | |||||||||||||||||||||||||||||||
| HAZOP study for Salalah LPG Project – Vendor Packages HAZOP [Gas Turbine Generator, Residual Gas Compressor, Turbo Expander, Boil off Gas Compressors] | Oman Gas Co, Oman/ Petrofac | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Hydrogen Generation Unit (HGU) of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | TechnipFMC, Delhi / Engineers India Limited, Delhi / Visakh Refinery, HPCL | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Wellpads and Mangala Processing terminal Phase-1 under MungalaUpgradation Project (MUP-2) | Simon India Limited, Faridabad / Cairn Energy Delhi | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Full Conversion Hydrocracker Unit (FCHCU) of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | L&T Hydrocarbon Enginering, Vadodara / Engineers India Limited, Delhi / Visakh refinery, HPCL | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Crude Distillation Unit (CDU) and Vacuum Distillation Unit (VDU)of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | / Engineers India Limited, Delhi / Visakh refinery, HPCL | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Multi Purpose Tank Project for Sohar Refinery, Oman | Towell Engineering Group, Oman / Valdel, Oman / Sohar Refinery, Oman | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Ammonia & Urea Plant for Hindustan Urvarak and Rasayan Limited (HURL), India | L&T Hydrocarbon Enginering, Vadodara | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Hydrogen Generation Unit (HGU) Vendor packages [PSA Package, Hydrogen Circulation Compressor Package, Recycle Hydrogen Compressor Package, Nitrogen Circulation Compressor Package & Chemicals Injection Packages as part of Visakh Refinery Modernization Project (VRMP) | TechnipFMC, Delhi / Engineers India Limited, Delhi / Visakh Refinery, HPCL | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of SAMA ASP field Alkaline Surfactant Polymer (ASP) package and Water softening unit (WSU) | KOC Kuwait/ SNF, France | 2018 | |||||||||||||||||||||||||||||||
| HAZOP of Shell Majnoon CPF-II (Oil separation & gas Compression),Iraq | Basra Oil Company, Iraq/Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP of Shell Majnoon CPF-II (Oil separation & gas Compression) – Vendor Packages (LP& MP Compressor, Water Treatment Package, Fuel Gas Treatment Package, Hot Oil Heater Package, IA & N2 generation package, Chemical Injection Package & Flare Package) | 2019 | ||||||||||||||||||||||||||||||||
| HAZOP of HRSG for RCF, Trombay& NFL Panipat, Nangal&Bhatinda plants | Thermax, Pune / RCF Trombay / NFL | 2019 | |||||||||||||||||||||||||||||||
| HAZOP study of Ain Tsila Field Development Project covering well pads, trunk lines to Central Processing facilities (CFP), Central Processing Facilities (CFP) and export pipeliens | ISARÈNE / Sonatrch, Algeria / Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP study of Ain Tsila Field Development Project Vendor Packages (Feed Gas Compressor, Sales Gas Compressor, Turbo Expander & Gas Turbine G/R) | ISARÈNE / Sonatrch, Algeria / Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP of Early tanks work for Sirchara Refinery, Thailand | Thai Oil /Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP study of Main Process & Utilities of Inlet Separation and Boosting Facility in Ohanet, Tinrhert Field Development Project | Sonatrach Algeria/ Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP study of Vendor Packages (Process Compressor, IA Compressor, Dryer, N2 generation package, Hot Oil Heater Package, Produced Water Treatment Package, Thermal Oxidiser package, Flare Package & N2 Compressor Package) of Inlet Separation and Boosting Facility in Ohanet, Tinrhert Field Development Project | Sonatrach Algeria/ Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP of Brown field modifications for Sirchara Refinery, Thailand | Thai Oil /Petrofac | 2019 | |||||||||||||||||||||||||||||||
| HAZOP of Armada Sterling –II (FPSO) | SP Armada, Mumbai | 2020 | |||||||||||||||||||||||||||||||
| HAZOP of all Vendor Packages of Thai Oil project | Thai Oil /Petrofac | 2020 | |||||||||||||||||||||||||||||||
| HAZOP of Interface between Saipem, Petrofac& Samsung of Thai oil project | Thai Oil /Petrofac | 2020 | |||||||||||||||||||||||||||||||
| HAZOP for D31 cluster development offshore platfrom, Mumbai offshore | Arch Softwares Private Limited, Delhi | 2020 | |||||||||||||||||||||||||||||||
| HAZOP Of LPG Pipeline for East India Petroleum | MS Aquagreen Engineering Management Pvt. Ltd, Vizag | 2020 | |||||||||||||||||||||||||||||||
| HAZOP of Yetagun LP phase II project | Petronas Malasiya | 2020 | |||||||||||||||||||||||||||||||
| HAZOP for Vendor Pacakges(ETP ,PSA, Reformer SCR, Reformer Fan, Process Gas Compressors, SSP Granulator and SSP Conveyor, Combustion Air Blower &Sparging Air Compressor, Sulphuric acid loading arm, &Sidestream Filter)-Thai Oil Clean Fuel Projectcooling water, HP BFW Pumps, IA-PA Compressor & Air Dryer, De-Oil | Thai Oil /Petrofac | 2020 | |||||||||||||||||||||||||||||||
| HAZOP of RAZU ASP Pilot project | KOC Kuwait/ SNF,France | 2020 | |||||||||||||||||||||||||||||||
| HAZOP of UNLF ASP Pilot project | KOC Kuwait/ SNF,France | 2020 | |||||||||||||||||||||||||||||||
| HAZOP of new metering skid at ONGC-Hazira | ONGC/ Petro6 E&C / | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of Main process Nandasan Surface Facility Project (NSFP), Mehsana Asset | ONGC/HAL offshore | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of CNG stations – 25 nos. | SGL, Ahmadabad | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of CNG stations – 10 nos. | MGL, Mumbai | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of Vendor Packages (Condensate Recovery System, Air Compressor, IVT Oil Mist Generator, Lube Oil Console, SRR HVAC & Substation HVAC) of CDU-VDU Project (EPCC- 01 UNIT – 501/506) of HPCL | L&T Hydrocarbon Engineering / HPCL | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of FCCU, UGSS, LPGTU, Offsite & Utilities for Nayara Refinery, Vadinar | NAYARA Refinery/ Technip Energies, Delhi | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of Vendor packages (HVAC for Sub Station, HVAC for SRR Building, Oil Mist Generator, Feed Filter, Fire Water Pumps) of Full Conversion Hydrocracker Unit (FCHCU) (EPCC-02Package) for HPCL | L&T Hydrocarbon Engineering / HPCL | 2021 | |||||||||||||||||||||||||||||||
| HAZOP Study of FEED for RDG Terminal augmentation/addition of existing process facilities | Cairn Energy, Delhi/ Petro6 E&C, Chennai | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of vendor package (Oil Mist Lubrication Generation System) of Hydrogen Generation Unit (Epcc- 06 Package) for Visakh Refinery Modernisation Project, HPCL | Technip FMC Delhi / HPCL | 2021 | |||||||||||||||||||||||||||||||
| HAZOP Study of new RP-02 well pad. | Cairn Energy, Delhi/ Petro6 E&C Chennai | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of 9000KLD Pre- Treatment, RO and Zero Liquid Discharge System, Grasim Industries, Nagda, Madhya Pradesh, India | SUEZ water solutions, Bnagalore | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of Vendor packages (Enhanced Air Blower EAB, Nitrogen generation NGU, Refrigeration )as part of augmentation / Modifications under “Asset Development Plan-1 (ADP-1)” project | NAYARA Refinery/ Technip Energies, Delhi | 2021 | |||||||||||||||||||||||||||||||
| HAZOP of Vendor packages (Lift gas Compressor, Heater Treater, LP gas Compressors, WIP, ETP) as part of Nandasan Surface Facility Project for HAL & ONGC | ONGC/HAL offshore | 2021 | |||||||||||||||||||||||||||||||
| HAZOP study for Boiler package for IOCL Vadodara Refinery | Thermax, Pune | 2021 | |||||||||||||||||||||||||||||||
| HAZOP study for RHCU Project, Lithuania | Petorfac, Sharjah / Orlen, Litunia | 2021 | |||||||||||||||||||||||||||||||
| HAZOP study for Cairn Aishwarya infill wells project | Petro6, Chennai | 2021 | |||||||||||||||||||||||||||||||
| HAZOP study for VPSA for Schott Glass Project | Linde, Kolkata | 2021 | |||||||||||||||||||||||||||||||
| HAZOP study for Offshore WHP (East) - KG/OSDSF/GSKW Field Development Project, Kakinada | Petro6, Chennai / Oil India Limited | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of Cryogenic N2O2 plant for Tata Steel, Jamshedpur | Linde, Kolkata / Tata Steel | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of Residue Up-gradation Facility (RUF) Vendor packages as part of EPCC-03 VRMP PROJECT for L&T and HPCL Vizag refinery | L&T / HPCL | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of IOCL NGU Dumas plant for Linde & IOCL | Linde / IOCL | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of FW system package - CDU VDU project for L&T and HPCL Visakh refinery | L&T / HPCL | 2022 | |||||||||||||||||||||||||||||||
| HAZOP & SIL-UNLF test separator Package | KOC, Kuwait / SNF, France | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of HVAC & FW system as part of 077015C VRMP HPCL project for Technip & HPCL | Technip / HPCL | 2022 | |||||||||||||||||||||||||||||||
| Integrated HAZOP of RDG, RGT and Bridge as part of RGT project for Vedanta Limited Cairn Oil & Gas and Petro6E&C | Vedanta Limited Cairn Oil & Gas / Petro6E&C | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of Petro Fluidized Catalytic Cracking Unit (PFCCU) and LPGTU as part of NRL Expansion Project Detailed Engineering | tkIS Mumbai / NRL | 2022 | |||||||||||||||||||||||||||||||
| HAZOP Study for Utility Boiler for IOCL Lupech Baroda refinery project | Thermax / IOCL | 2022 | |||||||||||||||||||||||||||||||
| HAZOP of PFCC GTU, NHT, ISOM, Utilities as part of MS Block Project of HPCL RAJASTHAN REFINERY LIMITED | Technip Noida / HRRL | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study of Gas Compressors for Mahanagar Gas Limited | MGL, Mumbai | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study for N2 and H2 generation Package for Baruni Refinery | Air Products, Baroda / IOCL Baruni | 2022 | |||||||||||||||||||||||||||||||
| HAZOP Study of Cryogenic N2 O2 plant at ESL Bokaro | Linde, Kolkata | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study for N2 and Air dryer package for RDG | Petro6, Chennai / Cairn India Limited | 2022 | |||||||||||||||||||||||||||||||
| HAZOP Study for CLO & PRU for NRL | tKIS, Mumbai / Numaligarh Refinery | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study for CPF and gathering station as part of Atshan Field Development Project | Worley, Oman /Zallaf , Libiya | 2022-23 | |||||||||||||||||||||||||||||||
| HAZOP study of VCM and Offsite & Utilities for Mundra Petrochemical Complex | Adani Petrochemical / TKIS, Mumbai | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study for Main Process, Utilities and vendor packages for GCP-1/4/5 and PWIS plant as part of Jafurah Gas Compression Project | LTHE, Mumbai / Saudi Aramco | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study of VPSA Plant | Sesa Goa Vedanta limited / Linde, Kolkta | 2022 | |||||||||||||||||||||||||||||||
| HAZOP study for Nitorgen Plant – NRL Expansion Project | Linde, Kolkata / Numaligarh Refinery | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for South West Gas Field | LTHE, Vadodara / Sonatrach, Algeria | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study for FP Fractionator and Vacuum Column Furnace, LuPech IOCL Gujarat Refinery Project | JNK India Limited, Thane | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study for GAN Augmentation at Dahej | Linde, Kolkata | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for CCR Unit, Technip Noida | IOCL Panipat refinery | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study of N2 generation Package for PTA Unit | IOCL Paradip Refinery | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study for Bhagyam BWP05 Well pad early Hook-up | Cairn / Vedanta, Gurgaon | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study for Utility Boiler and associated system (Package-9A) for Rajasthan Refinery Project (RRP) of HRRL, Barmer, Rajasthan | Thermax, Pune | 2023 | |||||||||||||||||||||||||||||||
| HAZOP for Main Air Blower (MAB) and Wet Gas Compressor (WGC) packages in PFCC Unit for Numaligarh Refinery Limited (NRL) | tKIS, Mumbai | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study of Steam Circuit via LCF Reactor Feed Furnace (1P30-FF-2281) and Recycle Gas Furnace (1P30-FF-2781) of NRL RPTU project | JNK India Limited, Thane | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Safety Study for KJ Development project | Selan Exploration Technology Limited, Gandhinagar | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for Reactor Feed Heater and Hot Oil Heater as part of NRL expansion project for Numaligarh Refinery Limited (NRL) | Thermax, Pune | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for Pipeline Operating Centre (POC) Optimization of Yetagun onshore facility of Gulf Petroleum Myanmar Company Limited | Easy Chem Engineering, Chennai | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for BDZ Clean Water for BWP 06/15 | Petro6, Chennai / Cairn India Limited | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for Amine Regeneration Unit (ARU) as part of RHCU OSBL Project for ORLEN Lietuva | Petrofac, Sharjah | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for VCM Storage, Offsite & Utilities as part of Adani Green PVC Project of Mundra Petrochemical Ltd. | tKIS, Mumbai | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study for CCR Heater package of NRL | JNK India Limited, Thane | 2023 | |||||||||||||||||||||||||||||||
| HAZOP Study for Nitrogen Generation Package at Numaligarh Refinery Limited (NRL) Expansion Project | Linde India Limited, Kolkata | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for air dryer package for CCR Reactor – regenerator as part of IOCL Panipat refinery project | Technip Energies, Noida | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for NE field Stage-III (Phase-2) project | Petro6, Chennai / Cairn India Limited | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study of Poly Butadiene Rubber (PBR) Plant of capacity 60 KTPA along with associated facilities at, “IOCL Panipat Refinery & Petrochemical Complex“, At Panipat | tKIS, Mumbai | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for Utilities and tie-ins as part of RHCU OSBL Project for ORLEN Lietuva | Petrofac, Sharjah | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study of Export Pipeline and CPF for Atshan field development Libya | Worley, Oman | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study for CDU VDU Revamp project for design case 4A for HPCL - Mittal Energy Limited, GGSR Bathinda (Punjab) | Technip Energies | 2023 | |||||||||||||||||||||||||||||||
| HAZOP study of Nitrogen Generation Unit (NGU) plant for IOCL Panipat Project | Linde India Limited, Kolkata | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Polylactic Acid (PLA) Plant of Gulf Biopolymers Industries Ltd (GBI) in KEZAD, Abu Dhabi | tKIS, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study of N2O UHP Plant at Hyderabad | Linde India Limited, Kolkata | 2024 | |||||||||||||||||||||||||||||||
| HAZOP Study for Flue Gas Power Recovery Turbine Package (PRT) in PFCCU at Numaligarh Refinery Limited (NRL) Expansion Project | tKIS, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP Study of Gas Compression Plants (HZEM GCP-4, HZEM GCP-7 and JNAB GCP-1) and associated vendor packages (Odour Abatement package, Flare package, Burn Pit package, Flare Gas Recovery Package, Chemical injection packages, Instrument Air Compressors, IA Dryer, N2 generation package, Fluid Barrier system for API pumps, Plan 53-B API pump, Potable Water Chiller package, Two Stage Compressor, Propane Compressor package) as part of overall Jafurah Development Program Phase-II for Saudi Arabian Oil Company | L&T, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for RDG additional infill wells project FEED for Inlet Gas Compression Project | Nauvata Energy Transition Enterprise Private Limited, Bangalore | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Jetty Pipelines connectivity from First Chemical Berth (FCB) transition platform to Third Chemical Berth (TCB) | Aegis Logistic Limited, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for NITRON 5000 plant for Waaree, Vapi, India | Linde India Limited, Kolkata | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Nitron 1500 Renew Power Project, Dholera, Gujrat, India | Linde India Limited, Kolkata | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Heat Pump Compressor Package (1P25-KA-3181) in PFCCU at Numaligarh Refinery Limited (NRL) Expansion Project | tKIS, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Gas plant (Train-3 and Train-4) of Jafurah Gas Plant comprises of Open art facilities, Acid Gas Removal Unit (AGRU), Natural Gas Liquid Recovery Unit (NGLRU) and vendor packages [Booster Compressor, Propane Compressor, Sales Gas Compressor, Stabilizer Overhead Compressor, Turbo Expander / Compressor, Regeneration Gas Compressor, Chemical injection packages] as part of Jafurah Phase-II project of Saudi Aramco | L&T, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for adding another Condensate reinjection pump at Yestagun A platform in Yetagun gas and condensate field | Petro6, Chennai / Cairn India Limited | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study of 12 wells hookup in MWP 03, 04, 06, 08, 09, 19 & 21 | Petro6, Chennai / Cairn India Limited | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study of UHP auxiliary system of N2O plant (UHP250) | Linde India Limited, Kolkata | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Amara Raja VPSA (V-40) plant to cover Product O2 from BLOC to Customer tie-in, Instrument Air Distribution (N01) and CW supply from customer & return line | Linde India Limited, Kolkata | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for feed for Alkali Surfactant Polymer (ASP) injection and surface facility development at MWP11 & MWP19 | Petro6 E&C, Chennai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Hydrocracking Unit (HCU-1) for BAYTOWN refinery as part of Exxon GOLD Baytown Project | Technip Energies India / ExxonMobil Corporation, USA | 2024 | |||||||||||||||||||||||||||||||
| HAZOP Study for Regen Gas Blower Package in PRU at Numaligarh Refinery Limited (NRL) Expansion Project | tkUIPL, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for M4 plot located at Pir Pau Terminal Gavanpada | Aegis Logistics Limited, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for JNPA, A2 Terminal Mumbai | Aegis Logistics Limited, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Cracker Furnace for Reliance India Limited Dahej Manufacturing Division (DMD) and Nagothane Manufacturing Division (NMD) Cracker de-bottlenecking Project (87.5TPH) | JNK India Limited | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for GOX, GAN, GAR import/ export network from TATA KPO to JSL Dubari plant | Linde India Limited | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study of RTO Package for Poly Butadiene Rubber (PBR) Plant of capacity 60 KTPA along with associated facilities at, “IOCL Panipat Refinery & Petrochemical Complex“, At Panipat | tKIS, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Olefins Conversion Unit (OCU), Cumene Phenol Unit (CPU), Offsite & Utilities, Vendor packages [Regenerative Thermal Oxidizer (12A-220), Fired heater (11F-501/502), Air compressor /Turbo Expander (12K-210/211), Propylene Refrigeration compressor (11K-521), Regeneration Compressor (11K-601A/B), Hydrogen & Propane Compressors (12K-920 & 12K-111), Vacuum Package (12A-131, 12A-310, 12A-811 & 12A-812)] as part of Haven Project for M/s. Haldia Petrochemicals Ltd. | tKUIPL, Mumbai | 2024 | |||||||||||||||||||||||||||||||
| HAZOP study for Gas Supply System (Storage Tank, Vaporiser & PRS) | Linde India limited | 2024 |
Service Description | Clients | Year |
|---|---|---|
| SIL classification study for Polylactic Acid (PLA) Plant of Gulf Biopolymers Industries Ltd (GBI) in KEZAD, Abu Dhabi | tKIS, Mumbai | 2024 |
| SIL classification study for RDG additional infill wells project FEED for Inlet Gas Compression Project | Nauvata Energy Transition Enterprise Private Limited, Bangalore | 2024 |
| SIL classification, verification and SRS studies for Train-3 and Train-4 of Jafurah Gas Plant as part of Jafurah Phase-II project of Saudi Aramco | L&T, Mumbai | 2024 |
| SIL classification study of 12 wells hookup in MWP 03, 04, 06, 08, 09, 19 & 21 | Petro6 E&C, Chennai | 2024 |
| SIL classification study for feed for Alkali Surfactant Polymer (ASP) injection and surface facility development at MWP11 & MWP19 | Petro6 E&C, Chennai | 2024 |
| SIL classification study for Cracker Furnace for Reliance India Limited Dahej Manufacturing Division (DMD) and Nagothane Manufacturing Division (NMD) Cracker de-bottlenecking Project (87.5TPH) | JNK India Limited | 2024 |
| SIL verification study for fired heaters for CCR unit- Panipat Refinery Expansion Project | Technip, Noida | 2024 |
| SIL Classification and SIL verification study for South West Gas Field | LTHE, Vadodara / Sonatrach, Algeria | 2023 |
| SIL classification study for Nitrogen Generation Package (NGU) At NRL Expansion Project | Linde India Limited, Kolkata | 2023 |
| SIL classification study for Utility Boiler and associated system (Package-9A) for Rajasthan Refinery Project (RRP) of HRRL, Barmer, Rajasthan | Thermax, Pune | 2023 |
| SIL classification study for Reactor Feed Heater and Hot Oil Heater as part of NRL expansion project for Numaligarh Refinery Limited (NRL) | Thermax, Pune | 2023 |
| SIL Classification (LOPA) study for Amine Regeneration Unit (ARU) as part of RHCU OSBL Project for ORLEN Lietuva | Petrofac, Sharjah | 2023 |
| SIL Study for CCR Heater package of NRL | JNK India Limited, Thane | 2023 |
| SIL classification study for FP Fractionator and vacuum column Furnace for HCU revamp of Lupech (J-18) project | JNK India Limited, Thane | 2023 |
| SIL classification study for VCM Storage, Offsite & Utilities as part of Adani Green PVC Project of Mundra Petrochemical Ltd | tKIS, Mumbai | 2023 |
| SIL classification study of Poly Butadiene Rubber (PBR) Plant of capacity 60 KTPA along with associated facilities at, “IOCL Panipat Refinery & Petrochemical Complex“, At Panipat | tKIS, Mumbai | 2023 |
| SIL classification study for NE field Stage-III (Phase-2) project | Petro6 E&C, Chennai | 2023 |
| SIL Classification & Verification study for CPF and gathering station as part of Atshan Field Development Project | Worley, Oman /Zallaf , Libiya | 2022-23 |
| SIL Classification and SIL verification study of PFCC GTU, NHT, ISOM, Utilities as part of MS Block Project of HPCL Rajasthan Refinery Limited | Technip Noida / HRRL Refinery | 2022/2023 |
| SIL Classification, Verification and SRS study for RHCU Project, Lithuania | Petorfac, Sharjah / Orlen, Litunia | 2021-23 |
| SIL classification, verification and SRS Studies of Gas Compression Plants (HZEM GCP-4, HZEM GCP-7 and JNAB GCP-1) and associated vendor packages (Odour Abatement package, Flare package, Burn Pit package, Flare Gas Recovery Package, Chemical injection packages, Instrument Air Compressors, IA Dryer, N2 generation package, Fluid Barrier system for API pumps, Plan 53-B API pump, Potable Water Chiller package, Two Stage Compressor, Propane Compressor package) as part of overall Jafurah Development Program Phase-II for Saudi Arabian Oil Company | L&T, Mumbai | 2023 |
| HAZOP study for Offshore WHP (East) - KG/OSDSF/GSKW Field Development Project, Kakinada | Petro6, Chennai / Oil India Limited | 2022 |
| SIL Classification study - UNLF test separator package | KOC Kuwait / SNF France | 2022 |
| SIL Classification study for Utility Boiler for IOCL Lupech Baroda refinery project | Thermax / IOCL | 2022 |
| SIL Classification, SIL verification and SRS preparation study for Main Process, Utilities and vendor packages for GCP-1/4/5 and PWIS plant as part of Jafurah Gas Compression Project | LTHE, Mumbai / Saudi Aramco | 2022 |
| SIL Classification study for N2 and H2 generation Package for Baruni Refinery | Air Products, Baroda / IOCL Baruni | 2022 |
| SIL classification study of VCM and Offsite & Utilities for Mundra Petrochemical Complex | Adani Petrochemical / TKIS, Mumbai | 2022 |
| SIL Classification & Verification of Main process Nandasan Surface Facility Project (NSFP), Mehsana Asset | ONGC/HAL offshore | 2021 |
| SIL Classification & Verification of FCCU, UGSS, LPGTU, Offsite & Utilities for Nayara Refinery, Vadinar | NAYARA Refinery/ Technip Energies, Delhi | 2021 |
| SIL Classification & Verification Study of FEED for RDG Terminal augmentation/addition of existing process facilities | Cairn Energy, Delhi/ Petro6 E&C, Chennai | 2021 |
| SIL Classification & Verification Study of new RP-02 well pad. | Cairn Energy, Delhi/ Petro6 E&C Chennai | 2021 |
| SIL Classification & Verification of Vendor packages (Enhanced Air Blower EAB, Nitrogen generation NGU, Refrigeration )as part of augmentation / Modifications under “Asset Development Plan-1 (ADP-1)” project | NAYARA Refinery/ Technip Energies, Delhi | 2021 |
| SIL Classification & Verification of Vendor packages (Lift gas Compressor, Heater Treater, LP gas Compressors, WIP, ETP)as part of NSFP | ONGC/HAL offshore | 2021 |
| SIL Classification study for Cairn Aishwarya infill wells project | Petro6, Chennai | 2021 |
| SIL Classification & Verification and preparation of SRS of Thai Oil Project vendor Packages [ETP, PSA Package, SCR package, Reformer, FD & ID Fans, Feed Compressors, SSP granulation Package / SSP Conveyor, Utilities, Combustion Air Blower, Sparging Air Compressor, Incinerator Air Blower, IA-PA Compressors, Air Dryer, De-oil Filter, Side stream Filter, Cooling Water Pump, HP BFW Pump, Sulphuric Acid Loading Arm & Chemical Injection Packages] using shell software SIF Pro | Thai Oil / Petrofac | 2019- 2021 |
| SIL study for Boiler package for IOCL Vadodara Refinery | Thermax, Pune | 2021 |
| SIL Classification & Verification of Tank farm modifications & augmentation (Brownfield), Thai Oil project using shell software SIF Pro | Thai Oil / Petrofac | 2020 |
| SIL Classification & Verification of all Vendor Packages for Tinhert Field Development Project EPC - 1, Algeria | Sonatrach Algeria/ Petrofac / ISARÈNE | 2020 |
| SIL Classification & Verification of Ain Sila Main process | Sonatrch, Algeria / Petrofac | 2020 |
| SIL Classification & Verification of for all Vendor Packages–Ain Sila Project | ISARÈNE / Sonatrch, Algeria / Petrofac | 2020 |
| SIL Classification & Verification of Yetagun LP phase II project for PETRONAS | PETRONAS, Malaysia | 2020 |
| SIL Classification and Verification of NC-200 Erawin Field Development Project | ZALLAF LIBYA (ZLOG) / Worley, Oman | 2020 |
| SIL Classification & Verification of Hydrogen Generation Unit Main Process, Utilities and Vendor Packages (FGPSA & Compressors) | Technip FMC /EIL/HPCL | 2020 |
| SIL Classification & Verification study for Shell Majnoon Central Processing Facilities (CPF-2) | Basra Oil Company (BOC) Iraq/ Petrofac, | 2019 |
| SIL Classification & Verification of HRSG for RCF, Trombay & NFL plants at Panipat, Nangal & Bhatinda | Thermax, Pune / RCF Trombay / NFL | 2019 |
| SIL Classification & Verification of Tinrhert Field Development Project-EPC-1 (Inlet Separation and Boosting Facilities in Ohanet) – Main Process & Utilities | Sonatrach Algeria/ Petrofac | 2019 |
| SIL Classification & Verification of Tinrhert Field Development Project-EPC-1 (Inlet Separation and Boosting Facilities in Ohanet) – Vendor Packages | Sonatrach Algeria/ Petrofac | 2019 |
| SIL Classification & Verification study for Salalah LPG Project – Vendor Packages [Gas Turbine Generator, Residual Gas Compressor, Turbo Expander, Boil off Gas Compressors] | Oman Gas Co, Oman /Petrofac | 2018 |
| SIL Classification & Verification of Hydrogen Generation Unit (HGU) of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | TechnipFMC, Delhi / Engineers India Limited, Delhi / Visakh Refinery, HPCL | 2018 |
| SIL Classification & Verificationof Full Conversion Hydrocracker Unit (FCHCU) of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | L&T/EIL / HPCL | 2018 |
| SIL Classification & Verification of Crude Distillation Unit (CDU) and Vacuum Distillation Unit (VDU)of Visakh Refinery, HPCL under Viasakh Refinery Modernisation Project | L&T/EIL / HPCL | 2018 |
| SIL Classification & Verification of Hydrogen Generation Unit (HGU) vendor packages [ PSA, Hydrogen Circulation Compressor Package, Recycle Hydrogen Compressor Package, Nitrogen Circulation Compressor Package & Chemicals Injection] of HPCL, Visakh Refinery as part of Visakh Refinery Modernization Project (VRMP) | TechnipFMC, Noida / Engineers India Limited, Delhi / Visakh Refinery, HPCL | 2018 |
| SIL Classification & Verification of LPG Odorant Package & Extender Oil Pumps – Petro Rabigh Project | Saudi ARAMCO / Petrofac | 2017 |
| SIL Classification & Verification of Balance System (Utility Header, HT deletion of Underground line & Requirement of LPG tanker emergency draining for Jazan Refinery Tank Farm Project | Petrofac, KSA / ARAMCO, KSA | 2017 |
| SIL Classification & Verification of IGHDS Unit of Bongaigaon Refinery | Indian Oil | 2017 |
| SIL Classification & Verification of vendor packages [Chemical Injection package, Side stream filter package, Sulphur loading arm and vapour recovery package] - Fadhili Gas project | Saudi ARAMCO / Petrofac | 2017 |
| SIL Classification & Verification for Mundra LPG terminal | Adani Oil & gas /Simon India Limited, Faridabad | 2017 |
| SIL Classification & Verification of packages (Wet Air Oxidation, Thermal oxidiser and Chemical injection packages) for Jazan Refinery Tank Farm Project | Saudi ARAMCO / Petrofac | 2017 |
| SIL Classification & Verification for Compressor and heater packages Indmax Gasoline Hydrogen De-Sulphurization (IGHDS) Unit for Bongaigaon Refinery of IOCL | Technip, Mumbai | 2017 |
| SIL Classification & Verification study for FPSO – Main Process & utilities, Avantgarde / Tuff-offshore, Singapore | Tuff-offshore, Singapore | 2016 |
| SIL classification & Verification study for FPSO – Vendor Packages | Tuff-offshore, Singapore | 2016 |
| SIL classification & SIL Verification Study of LPG, Benzene & Para-xylene Tanks, Petrorabigh | Saudi ARAMCO /Sumitamo Japan | 2016 |
| SIL classification & SIL Verification Study –GSU and TGTU, Fadhili Gas Plant | Saudi ARAMCO / Petrofac | 2016 |
| SIL Classification & Verification for HRSG, RCF-Thal | Thermax, Pune | 2016 |
| SIL Classification & Verification of Reggane Project (Vendor Packages) – Algeria | GRN, Algeria / Petrofac | 2015 |
| SIL Classification & Verification Ravva TL & Offshore well platforms | Cairn Energy, Delhi | 2015 |
| SIL Classification & Verification of Salalah LPG Extraction Project, Oman | Oman Gas Co, Oman Petrofac | 2015 |
| SIL Classification & Verification for Panna Process Complex | British Gas, Mumbai | 2014 |
| SIL Classification & Verification for EOR project | Cairn Energy, Delhi | 2014 |
| SIL Classification & Verification for RGT 100 MMSCFD | Cairn Energy, Delhi | 2014 |
| SIL Classification & Verification of Alrar Inlet Separation and Boosting Facilities (Process, Utility system & Vendor Packages) – Algeria | Sonatrach Algeria / Petrofac | 2014 |
| SIL Classification & Verification of MUP FEED | Cairn Energy, Delhi | 2014 |
| SIL Classification & Verification of QPS Facilities | Cairn Energy, Delhi | 2014 |
| SIL Classification & Verification for QPS Managala EOR | Cairn Energy, Delhi | 2014 |
| SIL Classification & Verification for Bundle Change Project – Tapti Complex | BGEPIL, Mumbai | 2014 |
| SIL Classification & Verification Reggane Project (main process & utilities) – Algeria | GRN, Algeria / Petrofac | 2014 |
| SIL Classification & Verification of MPT Modifications- EOR project | Cairn Energy, Delhi | 2013 |
| SIL Classification & Verification of Raag 1 & 3 wellpads | Cairn Energy, Delhi | 2013 |
| SIL verification of high pressure tripson recycle gas compressor | HMEL, Bhatinda | 2013 |
| SIL Classification & Verification for Jazan Refinery Tank Farm (NTF & STF) | Saudi ARAMCO / Petrofac | 2013 |
| SIL Classification & Verification for Jazan Refinery Vendor Packages (NTF & STF) | Saudi ARAMCO / Petrofac | 2013 |
| SIL Classification & Verification of FCCU,UGSS, DHDS, NHT,CCR, GSU, ARU, SWS, CDU,VDU,VBU, COT, PIT & Utilities, Essar Refinery, Vadinar | Essar Oil Limited, Vadinar | 2012 |
| SIL Classification & Verification for AishwariyaWellpads (AWP08 & AWP07) | Cairn Energy, Delhi | 2012 |
| SIL Verification – Bilag Modernization Project | Bayer CropScience, Gujarat | 2012 |
| SIL Classification & Verification of Mangla Processing Terminal Train-4 | Cairn Energy, Delhi | 2011 |
| SIL Classification & Verification of VRGM IOCL Spur Line Project | L&T, Gulf/Cairn Energy Delhi | 2011 |
| SIL Classification & Verification of ORYX-GTL for new intermediate wax Tank at Doha | ORYX-GTL, Qatar | 2011 |
| SIL Classification & Verification of New Panna SPM Project | British Gas, Mumbai | 2011 |
| SIL Classification & Verification ofLPG Recovery Unit, GSU, CHU, CFU, Utilities, Tie-ins & Vendor Packages for ONGC Uran TL | ONGC/ L&T, Fridabad | 2011 |
| SIL Classification & Verification of Crude Oil Storage Tanks, Propylene Storage Bullet, LPG Storage Bullet & Product Storage Tanks, IOCL Paradip Refinery, Orissa | Indian Oil, Delhi | 2011 |
| SIL Classification & Verification of Crude Oil Surge Vessel Project | British Gas, Mumbai | 2010 |
| SIL Classification & Verification of PL Brownfield works on PPA, Panna Field | Mustang, Mumbai | 2010 |
| SIL Classification & Verification of GSU, GDU, DPDU, GSU/GDU Common, Utilities & Vendor Packages for ONGC, Hazira TL | ONGC/ L&T, Fridabad | 2010 |
| SIL Classification & Verification of SUPP facilities at Mangala filed | Cairn Energy, Delhi | 2009 |
| SIL Classification & Verification of TCPP offshore process complex | British Gas, Mumbai | 2009 |
| SIL Classification & Verification of Radhanpur Terminal, Radhanpur | TATA projects, Mumbai | 2009 |
| SI SIL Classification & Verification of Bhoghat Terminal, Bhoghat | TCE, Mumbai | 2009 |
| SIL Classification & Verification of Hot Oil Heater on Panna Process Complex (PPA), offshore Mumbai | British Gas, Mumbai | 2008 |
| SIL Classification & Verification of Viramgam Terminal | Cairn Energy, Delhi | 2008 |
| SIL Classification & Verification of Zero Flaring Project on Panna Process Complex (PPA), offshore Mumbai | British Gas, Mumbai | 2006 |
Service Description | Clients | Year |
|---|---|---|
| Vent Dispersion Analysis for Ludhiana ASU project | Linde India Limited | 2024 |
| Flare and export tank dispersion and radiation study for Bakrol Field | Selan Exploration Technology Limited | 2024 |
| Vent Dispersion analysis for O2, N2 and Argon concentration for 1450 TPD ASU JSL Duburi Project. | Linde India Limited | 2024 |
| Flare dispersion analysis for integrated coal-based fertilizers complex at Talcher Fertilizers Limited, Angul District, Odisha, India | Airoil Flaregas Private Limited | 2024 |
| Vent Dispersion analysis for Sricity | Linde India Limited | 2023 |
| Flare dispersion analysis - Borouge 4 project | Airoil Flaregas Private Limited | 2022 |
| PSV vent dispersion Analysis | Simon India Limited / Adani Port | 2018 |
| Charaideo field Flare Dispersion and Radiation Analysis | Oilmax Energy Limited, Mumbai | 2018 |
| Thermal Plume Dispersion Analysis on Panna Field | BGEPIL, Mumbai | 2017 |
| Vent Dispersion Analysis from PSV discharge | Thermax, Pune / RCF, Thal | 2017 |
| Dispersion Analysis of Hot Flue gases from Compressor at LA for revised compressor flow rate | CIL, Gurgaon | 2016 |
| AWP-08 Flare Dispersion & Heat Radiation Analysis for different flow rates | CIL, Gurgaon | 2015 |
| H2S Dispersion analysis for RB3 well Flow Arm on RB Platform | CIL, Gurgaon | 2015 |
| Vent Dispersion Analysis – RAAG S1 | CIL, Gurgaon | 2014 |
| AWP-08 Flare heat radiation Analysis | CIL, Gurgaon | 2014 |
| Dispersion Analysis – MPT Export Tank Vent (Aishwariya Flow) | CIL, Gurgaon | 2014 |
| Plume Dispersion Analysis, Prem Pride | Mercator Oil & Gas | 2014 |
| Vent Dispersion Analysis from PSV’s Discharge on RWP-04 | CIL, Gurgaon | 2014 |
| Dispersion Analysis of Hot Flue gases from Compressor at LA | CIL, Gurgaon | 2014 |
| Dispersion analysis of STG gas | Mercator Oil & Gas | 2013 |
| Flare Heat Radiation Analysis | Mercator Oil & Gas | 2013 |
| Consequence analysis for PIT Installation of Well | BGEPIL, Mumbai | 2013 |
| Consequence analysis for flare carryover | BGEPIL, Mumbai | 2013 |
| Heat Radiation Study [Aishwariya (AWP08) Flare] | CEIL, Gurgaon | 2012 |
| Flare Radiation Analysis [BWP-15] | CEIL, Gurgaon | 2012 |
| Consequence Analysis of Gas leak on Accumulator | BGEPIL, Mumbai | 2012 |
| Heat Radiation Study [PPA Flare] | BGEPIL, Mumbai | 2012 |
| Consequence Analysis for New Panna SPM Facility, Panna Field | BGEPIL, Mumbai | 2011 |
| FSO Boiler Flue Gas Dispersion Analysis | Mercator offshore, Mumbai | 2010 |
| FSO Gas line flange Consequence Analysis | Mercator offshore, Mumbai | 2010 |
| Consequence Analysis of DOT roof tank at PPA | British Gas, Mumbai | 2010 |
| Risk Assessment of Domestic gas distribution | GGCL, Surat | 2010 |
| Tapti Vent & GT Exhaust vent Dispersion Analysis | British Gas, Mumbai | 2010 |
| Dispersion & Heat Radiation of Viramgam Terminal | CEIL/IOTL, Gurgaon | 2009 |
| Dispersion & Heat Radiation of MPT Flare, Mangla field | CEIL, Gurgaon | 2009 |
| DOT vent and HOH interaction–Consequence Analysis | British Gas, Mumbai | 2009 |
| Tanker Vent Dispersion Analysis at PPA | British Gas, Mumbai | 2009 |
| Vent Dispersion at PK Well Clean-up | British Gas, Mumbai | 2009 |
| Vent Stack – Dispersion & Heat Radiation | CEIL/IOTL, Mumbai | 2009 |
| MHN Flare Dispersion & Radiation Analysis | L&T Valdel, Mumbai | 2009 |
| Dispersion Analysis – Line Leak at Land Fall Point | CEIL, Suvali | 2009 |
| Consequence Analysis of Gas leak at Dadar, Mumbai | MGL, Mumbai | 2009 |
| Flare Dispersion & Radiation Analysis for PPN Onshore Gas Processing Facility | Technip & HOEC, Tamil Nadu | 2008 |
| Consequence Analysis for PPN Onshore Gas Processing Facility | Technip & HOEC, Tamil Nadu | 2008 |
| Dispersion Analysis for Flue Gas Nox & CO | Technip & HOEC, Tamil Nadu | 2008 |
| Heat Radiation Analysis for Flue Gas Fired Heater | British Gas, Mumbai | 2008 |
| Dispersion & Heat Radiation Analysis of PPA flare | British Gas, Mumbai | 2008 |
| Consequence Analysis for Subsea pipeline | British Gas, Mumbai | 2008 |
| Oil tank PVRV Vent Dispersion Analysis | British Gas, Mumbai | 2008 |
| Vent gas Dispersion and Heat Radiation Analysis at PL | British Gas, Mumbai | 2008 |
| Thermal Dispersion Analysis | L&T, Mumbai | 2007 |
| Dispersion and Radiation Analysis for MAERSK OIL QATAR | Kvaerner, Mumbai | 2007 |
| Dispersion analysis of most volatile material like Naphtha and MS for Vadinar Jetty Terminal | ESSAR OIL LTD., Mumbai | 2007 |
| Dispersion analysis for water dumping project | British Gas, Mumbai | 2007 |
| Consequence analysis for condensate loading facilities at Kakinada | RIL, Mumbai | 2007 |
| Consequence Analysis for Panna Flare, Dry and Wet Oil Tanks | Kvaerner, Mumbai | 2006 |
| Consequence Analysis for Propane Storage vessel, Ravva Facilities | CEIL, Ravva | 2006 |
| Dispersion and Heat Radiation Consequence Analysis for BF platform | Kvaerner, Mumbai | 2006 |
| Consequence Analyses of Mercaptan Storage and Dosing System | GGCL, Gujarat | 2006 |
| Consequence Analysis of HAPI Line Gas Venting | GGCL, Gujarat | 2006 |
| TPP Flare Heat Radiation Analysis | British Gas, Mumbai | 2006 |
| Dispersion and Heat Radiation Consequence Analysis for RIL PTA –3 Project | Kvaerner, Mumbai | 2005 |
| H2S Dispersion and Heat Radiation Consequence Analysis for Bunduq Project | Kvaerner, Mumbai | 2005 |
| Consequence Analysis for Bunduq Process Platform, Abu Dhabi | Kvaerner, Mumbai | 2004 |
| Dispersion and Heat Radiation Consequence Analysis for Panna Offshore Complex flare system | Kvaerner, Mumbai | 2004 |
| Vent gas dispersion analysis for optimisation of vent boom location on ONGC 9 well head platforms in Mumbai High –Phase I | Kvaerner, Mumbai | 2004 |
| Dispersion and Heat Radiation Consequence Analysis for Flare system of Tapti Offshore Platform | BGEPIL, Mumbai | 2004 |
| Vent gas dispersion analysis –ONGC 9 wellhead platforms in Mumbai High –Phase II | Kvaerner, Mumbai | 2004 |
| Consequence modelling for optimising the location of Vent Boom at Guari platform | Kvaerner, Mumbai | 2003 |
Service Description | Clients |
|---|---|
| QRA Sensitivity Runs – Brownfield Works at Panna Process Complex and Typical Satellite Wellhead Platform (PC), Panna Field | British Gas, Mumbai |
| QRA of Panna Process Complex & Typical Satellite Wellhead Platform (PC) – Post Brownfield (including subsea pipelines & Risers), Panna Field | British Gas, Mumbai |
| QRA of Porta Cabin on Satellite Wellhead Platforms (PC for Panna Field & STA for Tapti Field) | British Gas, Mumbai |
| QRA Sensitivity Runs – TPP LQ Passive Fire Proofing, Tapti Field | British Gas, Mumbai |
| QRA of LA / LB offshore platform, Suvali | Cairn Energy India Ltd. Gurgaon |
| QRA of PB Offshore platform Sensitivity run, PB | British Gas, Mumbai |
| QRA of Panna Process Complex – Post Crude Oil Surge Vessel, Panna Field | BG/LTV, Mumbai |
| QRA of EBOK Field [Wellhead, MOPU & FSO] | Mercator, Mumbai / Afren, UK |
| QRA of GA Wellhead Platform, Suvali | Cairn Energy India Ltd. Gurgaon |
| QRA of Ravva Wellhead Platforms, Ravva | Cairn Energy India Ltd. Gurgaon |
| QRA of WFB Wellhead Platform | Afren, UK |
| QRA of PB Wellhead Platform – PD, PE & MA Cluster | British Gas, Mumbai |
| QRA of PC Wellhead Platform – PG & PF Cluster | British Gas, Mumbai |
| QRA of PH Wellhead Platform – PJ Cluster | British Gas, Mumbai |
| QRA of PL Wellhead Platform – PK Cluster | British Gas, Mumbai |
| QRA STUDY incorporating all charges in Geleki plot plan | HAL OFFSHORE Limited |
| QRA study for Offshore WHP (East) - KG/OSDSF/GSKW Field Development Project, Kakinada | Petro6, Chennai / Oil India Limited |
Service Description | Clients | Year |
|---|---|---|
| EMERA study for Tapti Decommissioning Project Phase-II | L&T offshore, Mumbai | 2024 |
| EMERA study for Tapti Decommissioning Project Phase-I | L&T offshore, Mumbai | 2023 |
| FERA Study for RDG Terminal modification | CIL | 2021 |
| FERA Study for Well pad- Raageshwari | CIL | 2021 |
| FERA study for Nandasan surface facility ONGC | Petro6 | 2021 |
| FERA study for adani mundra lpg terminal project | SIMON INDIA LTD | 2018 |
| FERA Study-Mundra Terminal | TATA consulting Engineers Limited, Mumbai | 2018 |
| FERA-EERA for Adani Mundra LPG terminal, Jetty and Pipelines | TATA consulting Engineers Limited, Mumbai / Simon India Limited | 2017 |
| RGT FERA | CIL, Gurgaon | 2015 |
| Ravva Terminal FERA | CIL, Gurgaon | 2015 |
| FERA of Radhanpur Terminal | CIL, Gurgaon | 2014 |
| FERA of RGT100 facilities | CIL, Gurgaon | 2014 |
| FERA of SVL TL Post Slop oil tank and Modifications | CIL, Gurgaon | 2014 |
| VGT FERA – Post Booster Gas Compressor | CIL, Gurgaon | 2014 |
| FERA/EERA of LA Wellhead Platform | CIL, Gurgaon | 2013 |
| FERA/EERA of RI Wellhead Platform | CIL, Gurgaon | 2013 |
| EMERA / ESSA of Tapti complex & wellheads | BGEPIL, Mumbai | 2013 |
| EMERA of rig & boat based well intervention (07 Nos.) | BGEPIL, Mumbai | 2013 |
| FERA of Viramgam Terminal | CIL, Gurgaon | 2013 |
| FERA / EERA of Bhogat Terminal | CIL, Gurgaon | 2013 |
| FERA of Suvali Terminal, Post Crude Oil Tank | CIL, Gurgaon | 2013 |
| FERA of PB Wellhead Platform – PD, PE & MA Cluster | British Gas, Mumbai | 2012 |
| FERA of PC Wellhead Platform – PG & PF Cluster | British Gas, Mumbai | 2012 |
| EMERA of PB Wellhead Platform – PD, PE & MA Cluster | British Gas, Mumbai | 2012 |
| EMERA of PC Wellhead Platform – PG & PF Cluster | British Gas, Mumbai | 2012 |
| ESSA of PB Wellhead Platform – PD, PE & MA Cluster | British Gas, Mumbai | 2012 |
| ESSA of PC Wellhead Platform – PG & PF Cluster | British Gas, Mumbai | 2012 |
| FERA/EERA Study for Aishwariya Field Development [AWP08, AWP07 Well Pads], Rajasthan | CEIL/MMPL, Mumbai | 2012 |
| EMERA Study of Olpad CGS | GGCL, Surat | 2012 |
| EMERA Study of Udhana Pandesera | GGCL, Surat | 2012 |
| EMERA Study of Kim-II CNG | GGCL, Surat | 2012 |
| EMERA Study of Panoli CNG | GGCL, Surat | 2012 |
| EMERA Study of Bharuch Coco CNG | GGCL, Surat | 2012 |
| EMERA Study of Bardoli CNG | GGCL, Surat | 2012 |
| EMERA Study of 9 CGS and 2 Compressor Station | GGCL, Surat | 2012 |
| EMERA Study of 7 CNG stations | GGCL, Surat | 2012 |
| FERA of Saraswati [S1] Field, RJY | CEIL, Gurgaon | 2011 |
| FERA Study for Aishwariya Field Development [AWP08, AWP01 Well Pads and AWP08 –MPT Fluid Trunk Pipeline], Rajasthan | CEIL/Technip, Noida | 2011 |
| EERA Study for New Panna SPM Project, Panna Field | BGEPIL, Mumbai | 2011 |
| EMERA Study for Vareli CGS, Vareli (Ongoing) | GGCL, Surat | 2011 |
| EMERA Study for 8 CNG Stations, Gujarat | GGCL, Surat | 2011 |
| EMERA Study of 7 CNG Stations | GGCL, Surat | 2011 |
| FERA Study for Gas Charged-up at MPT, Mangla | CEIL, Gurgaon | 2010 |
| EERA Study for COSV, Panna Field | LTV/BG, Mumbai | 2010 |
| FERA & EERA of MPT capacity expansion Projects | CEIL, Gurgaon | 2010 |
| FERA & EERA of BA Wellpads – BP-15 | CEIL, Gurgaon | 2010 |
| FERA & EERA of EBOK Field [Wellhead, MOPU & FSO] | Mercator Offshore, Mumbai | 2010 |
| FERA of PL Wellhead Platform | British Gas, Mumbai | 2010 |
| FERA Study for Rageshwari Gas Terminal | CEIL, Gurgaon | 2009 |
| FERA Study for SUPP & EOR | CEIL, Gurgaon | 2009 |
| FERA Study for Radhanpur Terminal | CEIL, Gurgaon | 2009 |
| FERA Study for Viramgam Terminal | CEIL, Gurgaon | 2009 |
| FERA Study for Early Gas Supply System | CEIL, Gurgaon | 2009 |
| FERA Study for Bhogat Terminal, Bhogat | CEIL/TCE, Mumbai | 2009 |
Service Description | Clients | Year |
|---|---|---|
| Simultaneous production and drilling operations for BG India- ENESCO rig of PB and PE | BGEPIL, Mumbai | 2004 |
| SIMOPS –HAZID Study of Simultaneous Drilling and Production operations at offshore Platforms located in East Coast of India | CEIL, Delhi | 2006 |
| SIMOPS Study of Well Test at H-31 Rig | CEIL, Delhi | 2007 |
| SIMOPS of Production Activities on PANNA Platform | British Gas, Mumbai | 2008 |
| Ravva Pipeline Project SIMOPS Study | CEIL, Chennai | 2008 |
| SIMOPS of Construction of HOH on PPA | British Gas, Mumbai | 2008 |
| SIMOPS of Construction & Production facility | GGCL, Surat | 2009 |
| SIMOPS of Drilling & Production facility | HOEC, Chennai | 2009 |
| SIMOPS of Well Clean-up at PK | British Gas, Mumbai | 2009 |
| SIMOPS of Production & Construction | HOEC, Chennai | 2009 |
| SIMOPS of Drilling | HOEC, Chennai | 2009 |
| SIMOPS of RGT Gas charged-up at MPT, Mangla | CEIL, Gurgaon | 2010 |
| SIMOPS of MPT Train 4 Construction & Production | CEIL, Gurgaon | 2010 |
| SIMOPS of Drilling Campaign in Palar | CEIL, Gurgaon | 2010 |
| SIMOPS of Simultaneous Drilling & Production Operations | CEIL, Gurgaon | 2012 |
| SIMOPS for Diving Job at SVL | CIL, Gurgaon | 2014 |
| SIMOPS study for full conversion hydrocracker unit of HPCL visakh refinery, visakhapatnam | L&T Chiyoda Limited, Gujrat. | 2018 |
| SIMOPS Study for Crude Distillation Unit (CDU) & Vaccum Distillation Unit (VDU) (EPCC - 1 package) of HPCL Visakh Refinery, Visakhapatnam | L&T Chiyoda Limited, Gujrat. | 2018 |
| SIMOPS Study for Hydrogen Generation Unit (EPCC-06) at HPCL, Vizag, AP | Technip India Limited | 2018 |
| SIMOPS study for PFCC GTU, NHT, ISOM, Utilities as part of MS Block Project of HPCL RAJASTHAN REFINERY LIMITED | Technip Noida / HRRL | 2022 |
Service Description | Clients | Year |
|---|---|---|
| F&G Mapping Study for Detailed Engineering for Well Hookup at MWP17 & MWP20 | Petro6 E&C, Chennai | 2024 |
| F&G Mapping Study for Detailed Engineering for 12 Wells Hookup in MWP03,04,06,08,09,19&21 | Petro6 E&C, Chennai | 2024 |
| F&G Mapping Study for Detailed Engineering for SARA-05 Surface Facilities | Petro6 E&C, Chennai | 2024 |
| F&G Detection Optimization Study for NE Field | Petro6 E&C, Chennai | 2023 |
| F&G mapping study for Mangla Well pads | Petro6 E&C, Chennai | 2022 |
| H2S gas Detection Optimization Study for MPT | CIL, Gurgaon | 2013 |
| F&G Detection Optimization Study for Mangla infill wells | CIL, Gurgaon | 2013 |
| F&G Detection Optimization Study for Aishwariya Development Project | CEIL/MMPL, Mumbai | 2012 |
| Revised F&G for MPT & RGT | CEIL, Gurgaon | 2010 |
| Revised Bow-Tie for RGT & MPT | CEIL, Gurgaon | 2010 |
| F&G Optimisation System for MPT | CEIL, Gurgaon | 2009 |
| F&G Optimisation System for RGT | CEIL, Gurgaon | 2009 |
| Panna F&G Optimisation System | British Gas, Mumbai | 2009 |
| SVL – F&G Adequacy Study at Suvali | CEIL, Gurgaon | 2009 |
| F&G system optimization study for Ravva facilities | CEIL, Gurgaon | 2008 |
| F&G detection optimization of PPA complex and Panna wellhead platforms | British Gas, Mumbai | 2008 |
| TCPP F&G Optimisation System | British Gas, Mumbai | 2008 |
| F&G detection optimization on TPP complex | British Gas, Mumbai | 2007 |
Service Description | Clients | Year |
|---|---|---|
| Bow-Tie study for facilities under FEED of Inlet Gas Compression Project for Vedanta Limited. | Nauvata Engineering | 2024 |
| Bow-Tie Study for Gas Compression Plant (HZEM GCP-4, HZEM GCP-7 and JNAB GCP-1) as part of Jafurah Field Development phase-II | L&T, Powai | 2023 |
| Bow-Tie Study for Produced Water Injection System (PWIS), Gas Compression Plant (HMYM GCP-4, HMYM GCP-5 and HZEM GCP-1) as part of Jafurah Field Development phase-I | L&T, Powai | 2022 |
| Bow Tie for well services and drilling operation | BGEPIL, Mumbai | 2016 |
| Bow-Tie for Ravva platform and Onshore terminal | CIL, Gurgaon | 2013 |
| Bow-tie for MPT post EPC’s | CIL, Gurgaon | 2013 |
| Bow-Tie Study for Aishwariya Development Project | CEIL/MMPL, Mumbai | 2012 |
| Bow-Tie for Tapti offshore Wellhead Platforms , Tapti Field | British Gas, Mumbai | 2012 |
| Bow-Tie for Tapti offshore Complex, Tapti Field | British Gas, Mumbai | 2012 |
| Bow-Tie Analysis of GreatDrill Chetna | GIL, Mumbai | 2012 |
| Bow-Tie for Panna Wellhead Platfroms , Panna Field | British Gas, Mumbai | 2011 |
| Bow-Tie for Panna offshore Complex , Panna Field | British Gas, Mumbai | 2011 |
| Bow Tie of EBOK Field [Wellhead, MOPU & FSO] | Afren, UK | 2010 |
| Bow-Tie for Rageshwari Gas Terminal | CEIL, Gurgaon | 2009 |
| Bow-Tie for Mangla Process Terminal | CEIL, Gurgaon | 2009 |
| Bow-Tie for SUPP & EOR | CEIL, Gurgaon | 2008 |
| Bow-Tie for Tapti offshore Complex | British Gas, Mumbai | 2006 |
| Bow- Tie for Panna offshore process Complex | British Gas, Mumbai | 2006 |
Service Description | Clients | Year |
|---|---|---|
| 5 Yearly Review of Operation Safety Case through review of Armada Sterling II Safety Case in accordance with Offshore Installations | SP Armada Oil Exploration Pvt Ltd | 2020 |
| Design Review for Production facility - EOR ASP injection in Kuwait | SNF SA | 2019 |
| Safety Case Review & Update for D-1 Field FPSO | SP Armada Oil Exploration Pvt. Ltd., Mumbai | 2018 |
| Comprehensive review and update of Panna Operation Safety Case | Royal Dutch Shell | 2017 |
| Greatdrill Chaaru Safety Case Development, GIL, Mumbai | Greatship India Limited, Mumbai | 2016 |
| MB Operation Safety Case | BGEPIL | 2015 |
| HSE studies & safety case for- Prem Pride Tanker- Tandem Mooring | Mercator Oil & Gas | 2014 |
| Update Safety Case for EBOK Field post CFBX | AFREN, UK | 2013 |
| COMAH- Aishwarya field | CIL, Gurgaon | 2013 |
| HSE studies & COMAH report for Gudda (NI2/NI3) | CIL, Gurgaon | 2013 |
| HSE Case for Drilling Rig- GD Chetna | GIL, Mumbai | 2012 |
| Safety Case for Tapti Complex & Wellhead, Tapti Field | BGEPIL, Mumbai | 2012 |
| HSE Case for Jindal Drilling Rig | Jindal Drilling, Mumbai | 2012 |
| Bhagyam Safety Case – Post Slip stream degassing facility | CEIL, Gurgaon | 2012 |
| Update Safety Case for EBOK Field | AFREN, UK | 2012 |
| Safety Case for EBOK Field [Wellhead, MOPU & FSO] – Post WFB, Nigeria | AFREN, UK | 2011 |
| Design Safety Case for New Panna SPM Project, Panna Field | BGEPIL, Mumbai | 2011 |
| Safety Case for Semisub Drlg rig ‘WildCat’- Indonesia | ESSAR, Mumbai | 2011 |
| COMAH – Mangla Processing Terminal (Post Train 4 and Bhagya/Aishwariya Field), Rajasthan | CEIL, Gurgaon | 2011 |
| Safety Case for Panna Complex with existing SBM, Panna Field | BGEPIL, Mumbai | 2011 |
| Safety Case for Panna Wellhead Platforms, Panna Field | BGEPIL, Mumbai | 2011 |
| Design Safety Case for COSV, Panna Field | LTV/BG, Mumbai | 2010 |
| Safety Case Development for EBOK Field [Wellhead, MOPU & FSO] | Afren, UK | 2010 |
| COMAH – Rageshwari Gas Terminal | CEIL, Gurgaon | 2009 |
| COMAH – Mangla Processing Terminal | CEIL, Gurgaon | 2009 |
| Safety Case Development – Ravva Onshore Terminal | CEIL, Gurgaon | 2008 |
| COMAH – SUPP & EOR | CEIL, Gurgaon | 2008 |
| COMAH Report for South Rajasthan Field | CEIL, Chennai | 2006 |
| Safety Case Development - QRA of CB-OS/2 offshore & Suvali Onshore Facilities - HAZOP & HAZID - HSE Mgt System audit - FERA (Fire & Explosion Risk Analysis) - ALARP workshop | Cairn Energy Chennai | 2005 |
| Safety Case Development of Ammonia Storage and Processing Facilities - HAZID - Quantitative Risk Assessment (QRA) - ALARP | African Explosives Limited | 2005 |
| Facilitation of ‘Safety Case’ development – Panna & Tapti offshore fields | BGEPIL, Mumbai | 2003 |
Service Description | Clients | Year |
|---|---|---|
| PHSER of UZ 750 project at FEED Stage | ZADCO, UAE | 2013 |
| PHSER of Tapti Gas Compression platform – FEED Stage | British Gas India Limited, Mumbai | 2014 |
| PHSER of Ravva Terminal for RSGDP Project | Cairn India Limited, Gurgaon | 2014 |
| PHSER of Panna Process Complex modifications for New SBM project (PHSER-3) | British Gas India Limited, Mumbai | 2015 |
| PHSER of Tank installation project at Ravva Terminal | Cairn India Limited, Gurgaon | 2016 |